72 Churchill Ave, Alex Park, Harare, ZimbabweResidential · Agricultural · Commercial · Industrial
Your property. Your water plan.

You bought the property.
Why are you still renting your water?

Stop planning your day around the next delivery. Build a water system around your home, farm or business—with surveying, Class 10 casing, solar pumping and storage from Riverine.

Start with a US$70 survey. Get a site-specific recommendation before drilling.

Survey firstMake an informed drilling decision
Class 10 uPVCSpecified for the 40 m drilling offer
Solar + storagePlan beyond the drilled borehole
One teamFrom assessment to installation
Experience you can see

Trusted by businesses.
Ready for your property.

Explore the client project images supplied by Riverine—from manufacturing and mining to hospitality.

The borehole buyer’s checklist

7 things to check before paying for a borehole.

A drilling price is only the beginning. Use these seven checks to plan for usable water, a clear scope and a system suited to your property.

01

Survey before the rig arrives.

Begin with a site assessment and siting recommendation. Riverine’s survey is US$70; the survey cost is deducted from your preferred borehole package when you proceed with us.

02

Ask which casing you are buying.

Our US$920 offer covers 40 m drilling with Class 10 uPVC casing. Confirm casing specifications and the proposed installation scope in your written quotation.

03

Budget for the ground beneath you.

Forty metres is a pricing baseline, not a promise of the required final depth. Confirm additional depth, double casing and any site-specific work before proceeding.

04

Match the pump to the borehole.

Choose equipment around the tested borehole yield, pumping depth and your daily demand. Our solar pump system is US$980, fully installed, with suitability confirmed for your site.

05

Put a buffer between you and interruptions.

The 5,000 L storage system including tank is US$990. Agree on the installation layout and included components so stored water fits how you use your property.

06

Look for relevant project experience.

Ask about work in settings like yours. View Riverine’s supplied client images above and discuss the demands of your home, farm, hospitality or industrial project.

07

Plan the whole route—from ground to tap.

Bring assessment, drilling, casing, borehole development, yield testing, pumping and storage into one discussion. Agree on the scope and any water-quality testing needed for your intended use.

Discuss my property ↗
Build your water system

Clear prices.
A practical starting point.

Choose the services you need. All prices below are in US dollars.

FULLY INSTALLED

Solar pump system

US$980

Solar pumping system, fully installed. Equipment suitability confirmed for your borehole.

Ask about solar pumping ↗
5,000 LITRES

Water storage system

US$990

5,000 L storage system including tank. Confirm the included components and layout in your quote.

Plan my storage ↗

Survey cost is deducted from the price of your preferred borehole package when you proceed with Riverine. Final quotations confirm site conditions, depth, installation scope and any additional charges, including transport or extra casing where applicable.

Your next steps

From enquiry to a water plan.

STEP 01

Tell us about your property.

Share your location, intended water use and any existing borehole or storage.

STEP 02

Assess the site.

Arrange the survey and discuss an appropriate drilling and installation scope.

STEP 03

Get a written quotation.

Review the equipment, scope, costs and schedule before work begins.

Before you begin

A few useful answers.

Does the US$920 offer specify Class 10 casing?

Yes. The offer is for 40 m drilling with Class 10 uPVC casing. Your written quotation confirms the detailed scope.

Is the US$980 solar pump system fully installed?

Yes. This is the fully installed solar pump system price. Riverine confirms suitability for your borehole and the installation details in your quotation.

Does the US$990 storage system include the tank?

Yes, it includes a 5,000 L tank. Confirm the other included components and site layout in your written quotation.

Can a survey guarantee water or final drilling depth?

No. A survey informs siting, while actual groundwater conditions and the appropriate final depth are established during the project. Discuss yield testing and the requirements of your intended use.

Make a plan for your property

Let’s talk about your
next water source.

Send your location and intended water use. We’ll help you identify the next practical step.

WhatsApp us ↗